A captive foundry in Punjab, an associate company of International Tractors Limited (ITL) and part of the Sonalika Group, engaged MPM to resolve sand fusion and metal penetration affecting up to half of its castings.
The foundry, which supplies castings to ITL( the third-largest tractor manufacturer in India and a leading exporter) operates Rhino and KW molding lines producing GB housings, front axle brackets, trumpet housings, crank cases (3-bore and 4-bore), and differential housings. Capacity had been revised upward from 28,800 to 72,000 MTPA. The goal was to reduce sand fusion, metal penetration, and shot-blasting time without disturbing this expanded production base.
Lustron HPL was introduced in phases — 50% Lustron HPL with 50% existing Lustrous Carbon Additive (LCA) on days 1–2, 75% Lustron HPL on days 3–4, and 100% Lustron HPL from day 5 onward. Specified to VM 50±5%, Ash ≤6%, and 80% minimum passing at 0.212mm.
Improvements were evident within 18–24 hours, with no changes made to bentonite source, carbonaceous additive quality, sand source, water source, or inert fines levels (max 3.50%):
We deliver solutions that drive real improvements in quality, efficiency, and productivity.